ResearchTrend.AI
  • Communities
  • Connect sessions
  • AI calendar
  • Organizations
  • Join Slack
  • Contact Sales
Papers
Communities
Social Events
Terms and Conditions
Pricing
Contact Sales
Parameter LabParameter LabTwitterGitHubLinkedInBlueskyYoutube

© 2026 ResearchTrend.AI, All rights reserved.

  1. Home
  2. Papers
  3. 1809.03421
  4. Cited By
Performance Evaluation of the Quorum Blockchain Platform

Performance Evaluation of the Quorum Blockchain Platform

19 July 2018
A. Baliga
I. Subhod
P. Kamat
S. Chatterjee
ArXiv (abs)PDFHTML

Papers citing "Performance Evaluation of the Quorum Blockchain Platform"

24 / 24 papers shown
Should my Blockchain Learn to Drive? A Study of Hyperledger Fabric
Should my Blockchain Learn to Drive? A Study of Hyperledger Fabric
Jeeta Ann Chacko
R. Mayer
Hans-Arno Jacobsen
250
4
0
10 Jun 2024
What Blocks My Blockchain's Throughput? Developing a Generalizable
  Approach for Identifying Bottlenecks in Permissioned Blockchains
What Blocks My Blockchain's Throughput? Developing a Generalizable Approach for Identifying Bottlenecks in Permissioned Blockchains
Orestis Papageorgiou
Lasse Börtzler
Egor Ermolaev
Jyoti Kumari
Johannes Sedlmeir
212
0
0
02 Apr 2024
Blockchain for Finance: A Survey
Blockchain for Finance: A Survey
Hanjie Wu
Qian Yao
Zhenguang Liu
Butian Huang
Zhuang Yuan
Huayun Tang
Erwu Liu
AIFin
176
62
0
27 Feb 2024
A Model-Based Machine Learning Approach for Assessing the Performance of
  Blockchain Applications
A Model-Based Machine Learning Approach for Assessing the Performance of Blockchain ApplicationsInternational Conferences on Smart Internet of Things (ICCSIT), 2023
Adel Albshri
Ali Alzubaidi
E. Solaiman
99
2
0
20 Sep 2023
Analyzing the Performance of the Inter-Blockchain Communication Protocol
Analyzing the Performance of the Inter-Blockchain Communication ProtocolDependable Systems and Networks (DSN), 2023
João Otávio Massari Chervinski
Diego Kreutz
Xiwei Xu
Jiangshan Yu
356
21
0
20 Mar 2023
Blockchain-Empowered Trustworthy Data Sharing: Fundamentals,
  Applications, and Challenges
Blockchain-Empowered Trustworthy Data Sharing: Fundamentals, Applications, and ChallengesACM Computing Surveys (ACM Comput. Surv.), 2023
Linh-TX Nguyen
L. Nguyen
Thong Hoang
Dilum Bandara
Qin Wang
Qinghua Lu
Xiwei Xu
Liming Zhu
P. Popovski
Shiping Chen
237
51
0
12 Mar 2023
How To Optimize My Blockchain? A Multi-Level Recommendation Approach
How To Optimize My Blockchain? A Multi-Level Recommendation Approach
Jeeta Ann Chacko
R. Mayer
Hans-Arno Jacobsen
277
11
0
11 Jan 2023
SocChain: Blockchain with Swift Proportional Governance for Bribery
  Mitigation
SocChain: Blockchain with Swift Proportional Governance for Bribery Mitigation
Deepal Tennakoon
Vincent Gramoli
174
1
0
06 Jul 2022
Analysis of Distributed Ledger Technologies for Industrial Manufacturing
Analysis of Distributed Ledger Technologies for Industrial ManufacturingScientific Reports (Sci Rep), 2022
L. Nguyen
Arne Bröring
Massimo Pizzol
P. Popovski
AI4CE
256
17
0
16 May 2022
CollaChain: A BFT Collaborative Middleware for Decentralized
  Applications
CollaChain: A BFT Collaborative Middleware for Decentralized Applications
Deepal Tennakoon
Yi Hua
Vincent Gramoli
149
12
0
23 Mar 2022
A Survey of Verification, Validation and Testing Solutions for Smart
  Contracts
A Survey of Verification, Validation and Testing Solutions for Smart ContractsInternational Conference on Blockchain Computing and Applications (ICBCA), 2021
Chaïmaa Benabbou
Ö. Gürcan
112
9
0
07 Dec 2021
SPON: Enabling Resilient Inter-Ledgers Payments with an
  Intrusion-Tolerant Overlay
SPON: Enabling Resilient Inter-Ledgers Payments with an Intrusion-Tolerant Overlay
Lucian Trestioreanu
Cristina Nita-Rotaru
Aanchal Malhotra
R. State
147
2
0
18 Oct 2021
A Serverless Distributed Ledger for Enterprises
A Serverless Distributed Ledger for EnterprisesHawaii International Conference on System Sciences (HICSS), 2021
Johannes Sedlmeir
Tim Wagner
Emil Djerekarov
Ryan Green
Johannes Klepsch
Shruthi U K Rao
81
6
0
10 Oct 2021
On the Security of Permissioned Blockchain Solutions for IoT
  Applications
On the Security of Permissioned Blockchain Solutions for IoT ApplicationsIEEE Conference on Network Softwarization (NetSoft), 2020
Sotirios Brotsis
N. Kolokotronis
Konstantinos Limniotis
S. Shiaeles
181
6
0
08 Sep 2021
On the Suitability of Blockchain Platforms for IoT Applications:
  Architectures, Security, Privacy, and Performance
On the Suitability of Blockchain Platforms for IoT Applications: Architectures, Security, Privacy, and Performance
Sotirios Brotsis
Konstantinos Limniotis
G. Bendiab
N. Kolokotronis
S. Shiaeles
220
75
0
06 Sep 2021
TrustCross: Enabling Confidential Interoperability across Blockchains
  Using Trusted Hardware
TrustCross: Enabling Confidential Interoperability across Blockchains Using Trusted HardwareInternational Conference on Blockchain Technology and Applications (ICBTA), 2021
Y. Lan
Jianbo Gao
Ke Wang
Jiashuo Zhang
Zhenhao Wu
Yuesheng Zhu
Zhong Chen
152
17
0
23 Mar 2021
Scaling a Blockchain-based Railway Control System Prototype for Mainline
  Railways: a Progress Report
Scaling a Blockchain-based Railway Control System Prototype for Mainline Railways: a Progress Report
M. Kuperberg
120
3
0
11 Mar 2021
FASTEN: Fair and Secure Distributed Voting Using Smart Contracts
FASTEN: Fair and Secure Distributed Voting Using Smart ContractsInternational Conference on Blockchain (ICB), 2021
Sankarshan Damle
Sujit Gujar
Moin Hussain Moti
FedML
225
8
0
21 Feb 2021
Data Storage in the Decentralized World: Blockchain and Derivatives
Data Storage in the Decentralized World: Blockchain and Derivatives
Enis Karaarslan
E. Konacakli
182
30
0
18 Dec 2020
Multi-Shard Private Transactions for Permissioned Blockchains
Multi-Shard Private Transactions for Permissioned Blockchains
Elli Androulaki
Angelo De Caro
K. Elkhiyaoui
Christian Gorenflo
A. Sorniotti
Marko Vukolić
155
0
0
16 Oct 2020
FastPay: High-Performance Byzantine Fault Tolerant Settlement
FastPay: High-Performance Byzantine Fault Tolerant SettlementConference on Advances in Financial Technologies (AFT), 2020
M. Baudet
G. Danezis
A. Sonnino
266
65
0
25 Mar 2020
Towards Secure IoT Communication with Smart Contracts in a Blockchain
  Infrastructure
Towards Secure IoT Communication with Smart Contracts in a Blockchain Infrastructure
Sulaiman Khan
Hazrat Ali
Zahid Ullah
Abdul Hafeez
274
20
0
06 Jan 2020
Designing for Privacy and Confidentiality on Distributed Ledgers for
  Enterprise (Industry Track)
Designing for Privacy and Confidentiality on Distributed Ledgers for Enterprise (Industry Track)
Allison Irvin
Isabell Kiral
97
3
0
05 Dec 2019
The Nubo Virtual Services Marketplace
The Nubo Virtual Services Marketplace
J. Kempf
Sambit Nayak
Remi Robert
Jim Feng
Kunal Rajan Deshmukh
Anshu Shukla
Aleksandra Obeso Duque
N. Narendra
J. Sjöberg
158
4
0
11 Sep 2019
1
Page 1 of 1